Merged Sounding profiles derived with first Mace algorithm (mergesonde1mace)

Browse Data

Location

Shouxian, Anhui, China; Mobile Facility
  • Latitude: 32.5584
  • Longitude: 116.782
  • Publication Date: 2008-05-15
  • Start Date: 2008-05-15
  • End Date: 2008-12-28
  • Last Updated: 2012-01-09

Instrument Mentor

https://www.arm.gov/connect-with-arm/organization/instrument-mentors/list#mergesonde

David Turner
NOAA- Earth System Research Laboratory
Gerald Mace
University of Utah
David Troyan
Brookhaven National Laboratory
Scott Giangrande
Brookhaven National Laboratory
Tami Fairless
Brookhaven National Laboratory

DOI / Citation

http://dx.doi.org/10.5439/1034922
Atmospheric Radiation Measurement (ARM) user facility. 2008, updated hourly. Merged Sounding (MERGESONDE1MACE). 2008-05-15 to 2008-12-28, ARM Mobile Facility (HFE) Shouxian, Anhui, China (M1). Compiled by T. Fairless, S. Giangrande, D. Troyan, G. Mace and D. Turner. ARM Data Center. Data set accessed at http://dx.doi.org/10.5439/1034922.