DQR ID | Subject | Data Streams Affected | Data Quality Metric |
---|---|---|---|
D140618.4 | ENA/IMPACTOR/C1 - Impactor not installed | enaaosimpactorC1.a1 | Missing |
D150414.4 | ENA/NEPHELOMETER/C1 - Impactor not switching | enaaosimpactorC1.a1 | Suspect |
D150506.2 | ENA/AOS/C1 - AOS Instrument Repair, Calibration and Modification: Mentor Site Visit | enaaosimpactorC1.a1 | Incorrect |
D150702.4 | ENA/AOS/C1 - Reprocess: reprocessing from raw data in preparation for not-yet-released b1 level | enaaosimpactorC1.a1 | Does not affect quality |
D151106.1 | ENA/AOS/C1 - Impactor stuck at 10 micron | enaaosimpactorC1.a1 | Missing |
D151111.4 | ENA/AOS/C1 - Impactor size switch not connected | enaaosimpactorC1.a1 | Suspect |
D160427.7 | ENA/C1 - Reprocess: Slightly incorrect location fields | enaaosimpactorC1.a1 | Suspect |
D161025.6 | ENA/AOS/C1 - Instrument mentors working at the site | enaaosimpactorC1.a1 | Suspect |
D161128.8 | ENA/IMPACTOR/C1 - Data missing | enaaosimpactorC1.a1 | Missing |
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/01/2013 | 0000 | 02/19/2014 | 1351 | Missing |
Subject: | ENA/IMPACTOR/C1 - Impactor not installed |
DataStreams: | enaaosimpactorC1.a1 |
Description: | Impactor was not installed and inlet passed all sizes. This is equivalent to the impactor on the 10 um setting. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
03/27/2015 | 1052 | 03/30/2015 | 1800 | Suspect |
Subject: | ENA/NEPHELOMETER/C1 - Impactor not switching |
DataStreams: | enaaosimpactorC1.a1 |
Description: | AOS tech was working in the AOS and accidentally unplugged the impactor power supply. This left the impactor in the 10 micron state. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
04/22/2015 | 1700 | 04/27/2015 | 1700 | Incorrect |
Subject: | ENA/AOS/C1 - AOS Instrument Repair, Calibration and Modification: Mentor Site Visit |
DataStreams: | enaaosimpactorC1.a1 |
Description: | There was visit of 7 AOS instrument mentors to the ENA AOS during this period of instrument repair, calibration and modification. Instruments were occasionally off, or with no sample flow, or receiving calibration samples, etc. There was no productive sampling of ambient air during this period other than for testing. No data should be used for this period as ambient samples. Note: Two datastream are missing. The CAPS Extinction Monitor and the Greenhouse gas instrument. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
02/19/2014 | 0000 | 10/01/2015 | 2359 | Does not affect quality |
Subject: | ENA/AOS/C1 - Reprocess: reprocessing from raw data in preparation for not-yet-released b1 |
DataStreams: | enaaosimpactorC1.a1 |
Description: | End to end reprocessing to generate new a1 datastreams is needed so that when the harmonization software is released to production, we will be ready with the a1 datastreams that are input to the subsequent proccessing software. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
11/02/2015 | 1607 | 11/03/2015 | 1409 | Missing |
Subject: | ENA/AOS/C1 - Impactor stuck at 10 micron |
DataStreams: | enaaosimpactorC1.a1 |
Description: | No impactor state data saved for the entire period. Impactor was stuck at the 10 um position. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
02/19/2014 | 1351 | 04/26/2015 | 1016 | Suspect |
Subject: | ENA/AOS/C1 - Impactor size switch not connected |
DataStreams: | enaaosimpactorC1.a1 |
Description: | Impactor installed and plumbed, HOWEVER, the impactor's 'size read' switch NOT connected. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
09/29/2013 | 0941 | 04/30/2016 | 2359 | Suspect |
Subject: | ENA/C1 - Reprocess: Slightly incorrect location fields |
DataStreams: | enaaosimpactorC1.a1 |
Description: | Some of the instruments are being processed with the previous "GRW-Azores" lat/lon/alt instead of the new "ENA-Azores" lat/lon/alt. The differences are minor, but will be corrected. The respective GRW and ENA lat, lon, and alt values are as follows: GRW lat = 39.0911 ; ENA lat = 39.0916 ; GRW lon = -28.0297 ; ENA lon = -28.0257 ; GRW alt = 26 ; ENA alt = 30.48 ; |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
09/26/2016 | 0830 | 10/01/2016 | 0100 | Suspect |
Subject: | ENA/AOS/C1 - Instrument mentors working at the site |
DataStreams: | enaaosimpactorC1.a1 |
Description: | Instrument mentors working at the site. Sample lines and electrical connections being reconfigured. Instruments that had no work done on them may still be affected. |
Measurements: | enaaosimpactorC1.a1:
|
Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
11/11/2016 | 1600 | 11/16/2016 | 1400 | Missing |
Subject: | ENA/IMPACTOR/C1 - Data missing |
DataStreams: | enaaosimpactorC1.a1 |
Description: | Data missing due to data processing issues. Raw and a1 level data not affected. |
Measurements: | enaaosimpactorC1.a1:
|