DQR ID | Subject | Data Streams Affected |
---|---|---|
D091109.2 | SGP/AOS/C1 - Suspected leak in CCN and or problem with instrument optics | sgpaosccnC1.a1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
05/15/2009 | 0000 | 08/03/2009 | 0000 |
Subject: | SGP/AOS/C1 - Suspected leak in CCN and or problem with instrument optics |
DataStreams: | sgpaosccnC1.a1 |
Description: | The CCN signal started a slow decline during this period. The instrument was removed and shipped back to the mentor for repair. A leak was found in the instrument which would've decreased the over all signal. Whether this leak affected the rate of CCN growth with %SS is uncertain. |
Measurements: | sgpaosccnC1.a1:
|