DQR ID | Subject | Data Streams Affected |
---|---|---|
D061003.1 | NSA/METTWR/C1 - All data from 10m Level Missing | nsamettwr4hC1.b1 |
Start Date | Start Time | End Date | End Time |
---|---|---|---|
09/25/2006 | 2234 | 10/04/2006 | 2347 |
Subject: | NSA/METTWR/C1 - All data from 10m Level Missing |
DataStreams: | nsamettwr4hC1.b1 |
Description: | The winch that lowers the tower booms failed. Manual testing of the motor and winch allowed the booms to be lowered briefly and then raised back into position. A heavy freezing rain/icing event added extra weight to the booms. This extra weight was suspected as the cause as to why the 10m boom became disconnected. After a new motor was installed and all booms were lowered and re-raised the 10m level came back on line. |
Measurements: | nsamettwr4hC1.b1:
|