DQRID : D110805.2
Start DateStart TimeEnd DateEnd Time
04/02/2011214206/15/20111900
more
Subject:
SGP/SIRS/E20 - Upwelling LW incorrect
DataStreams:sgpsirsE20.b1, sgpsirs20sE20.a0
Description:
The UIR signal (up_long_hemisp datastream) had connection and cabling problems during the 
time period specified.  Site ops personnel replaced the Multiplexer on 6/15/2011 at 19:00 
resolving the problem.
Suggestions: 
Measurements:sgpsirs20sE20.a0:
  • Instantaneous Upwelling Pyrgeometer Thermopile Pyrgeometer(inst_up_long_hemisp_tp)
  • Instantaneous Upwelling Pyrgeometer Dome Thermistor Resistance Pyrgeometer(inst_up_long_dome_resist)
  • Instantaneous Upwelling Pyrgeometer Case Thermistor Resistance, Pyrgeometer(inst_up_long_case_resist)
more
sgpsirsE20.b1:
  • Upwelling Longwave Hemispheric Irradiance, Pyrgeometer, Minima(up_long_hemisp_min)
  • Instantaneous Dome Temperature(inst_up_long_dome_temp)
  • Instantaneous upwelling pyrgeometer case thermistor temperature, pyrgeometer(inst_up_long_case_temp)
  • Instantaneous Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_netir)
  • Upwelling longwave hemispheric irradiance, pyrgeometer, maxima(up_long_hemisp_max)
  • Upwelling (10 meter) Longwave Hemispheric Irradiance, Ventilated Pyrgeometer,
    Standard Deviation(up_long_hemisp_std)
  • 10 meter Upwelling Longwave Hemispheric Irradiance, Pyrgeometer(up_long_hemisp)
more

Close this window