Data Quality Reports for Session: 142549 User: cw101 Completed: 05/22/2012


TABLE OF CONTENTS

DQR IDSubjectData Streams Affected
D111017.1GAN/GNDRAD/M1 - IRT calibration errorgangndrad60sM1.b1
D111101.1GAN/GNDRAD/M1 - Incorrect up_long_hemispgangndrad20sM1.a0, gangndrad60sM1.b1
D120113.7GAN/SKYRAD/M1 - Degraded IRT mirrorganskyrad60sM1.b1
D120127.1GAN/SKYRAD/M1 - PIR2 failureganskyrad20sM1.a0, ganskyrad60sM1.b1
D120309.2GAN/SKYRAD/M1 - PIR1 failureganskyrad20sM1.a0, ganskyrad60sM1.b1


DQRID : D111017.1
Start DateStart TimeEnd DateEnd Time
09/23/2011074210/09/20110413
Subject:
GAN/GNDRAD/M1 - IRT calibration error
DataStreams:gangndrad60sM1.b1
Description:
The IRT surface temperature reported was incorrect because the analog output configuration 
did not agree with the data logger scale factors. The IRT configuration was corrected on 
10/9.
Measurements:gangndrad60sM1.b1:
  • Effective Surface (Skin) Temperature(sfc_ir_temp)
  • Surface Infra-Red Temperature Minima(sfc_ir_temp_min)
  • Surface Infra-Red Temperature Maxima(sfc_ir_temp_max)


Back To Table of Contents

DQRID : D111101.1
Start DateStart TimeEnd DateEnd Time
09/25/2011000010/05/20110444
Subject:
GAN/GNDRAD/M1 - Incorrect up_long_hemisp
DataStreams:gangndrad20sM1.a0, gangndrad60sM1.b1
Description:
The up_long_hemisp values from the pyrgeometer were much too low, hovering near or just 
above 100 W/m^2.  This was particularly noticeable when comparing these values to those 
derived from the surface IRT.   

On 10/05/11, at 0348Z, tower was lowered for removal of PIR SN35836 and installation of 
PIR SN35839; tower raised at 0444Z. Following installation of PIR SN35839, data quality 
plots indicate proper up_long_hemisp values.
Measurements:gangndrad20sM1.a0:
  • inst_up_long_hemisp_dome_resist
  • inst_up_long_hemisp_case_resist
  • inst_up_long_hemisp_tp

gangndrad60sM1.b1:
  • up_long_hemisp_std
  • Upwelling Longwave Hemispheric Irradiance, Unventilated Pyrgeometer, Maxima(up_long_hemisp_max)
  • Upwelling Longwave Hemispheric Irradiance, Unventilated Pyrgeometer, Minima(up_long_hemisp_min)
  • Radiation, longwave, at 10-m height, upwelling hemispheric irrad., 1-min avg(up_long_hemisp)
  • inst_up_long_hemisp_tp
  • inst_up_long_hemisp_dome_temp
  • inst_up_long_hemisp_case_temp


Back To Table of Contents

DQRID : D120113.7
Start DateStart TimeEnd DateEnd Time
11/29/2011142401/04/20120529
Subject:
GAN/SKYRAD/M1 - Degraded IRT mirror
DataStreams:ganskyrad60sM1.b1
Description:
The gold mirror was worn and needed to be replaced. Degradation of the mirror occurs 
gradually and it is difficult to determine when it begins to affect the measurement. To 
estimate the beginning of the problem, I used the time when the difference in IR sky 
temperature from the MWR3C was consistantly greater that 2.4K (2 times the resolution of the IRT 
measurement).

The problem was corrected when the mirror was replaced.
Measurements:ganskyrad60sM1.b1:
  • IR Brightness Temperature(sky_ir_temp)
  • sky_ir_temp_std
  • sky_ir_temp_min
  • sky_ir_temp_max


Back To Table of Contents

DQRID : D120127.1
Start DateStart TimeEnd DateEnd Time
12/12/2011000012/27/20110542
Subject:
GAN/SKYRAD/M1 - PIR2 failure
DataStreams:ganskyrad20sM1.a0, ganskyrad60sM1.b1
Description:
Increasing difference between PIR1 and PIR2 beginning December 12.  Suspected problem with 
PIR2 thermistor bridge or instrument thermistor.  OPS replaced PIR2 unit with a spare. 
The data from PIR2 after replacement appears to be normal.
Measurements:ganskyrad60sM1.b1:
  • down_long_hemisp2_max
  • down_long_hemisp2_min
  • inst_down_long_hemisp2_case_temp
  • down_long_hemisp2_std
  • inst_down_long_hemisp2_tp
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer2(down_long_hemisp2)
  • inst_down_long_hemisp2_dome_temp

ganskyrad20sM1.a0:
  • inst_down_long_hemisp2_case_resist
  • inst_down_long_hemisp2_tp
  • inst_down_long_hemisp2_dome_resist


Back To Table of Contents

DQRID : D120309.2
Start DateStart TimeEnd DateEnd Time
01/31/2012040002/09/20120600
Subject:
GAN/SKYRAD/M1 - PIR1 failure
DataStreams:ganskyrad20sM1.a0, ganskyrad60sM1.b1
Description:
PIR1 irradiance data are incorrect beginning Feb 4th and questionable as far back as Jan 
31st around 0400 UTC.  Site operations ceased Feb 9 before repairs were made.
Measurements:ganskyrad60sM1.b1:
  • inst_down_long_hemisp1_tp
  • inst_down_long_hemisp1_case_temp
  • down_long_hemisp1_std
  • Downwelling Longwave Hemispheric Irradiance, Shaded Pyrgeometer1(down_long_hemisp1)
  • inst_down_long_hemisp1_dome_temp
  • down_long_hemisp1_min
  • down_long_hemisp1_max

ganskyrad20sM1.a0:
  • inst_down_long_hemisp1_tp
  • inst_down_long_hemisp1_case_resist
  • inst_down_long_hemisp1_dome_resist


Back To Table of Contents



END OF DATA