Data Quality Reports for Session: 113240 User: julia1flah Completed: 07/18/2008


TABLE OF CONTENTS

DQR IDSubjectData Streams Affected
D021211.10NSA/GNDRAD/C1 - Unreasonable/missing PIR data due to maintenancensagndrad60sC1.a1
D021211.11NSA/GNDRAD/C1 - Noisy PIR Datansagndrad60sC1.a1
D021211.13NSA/GNDRAD/C1 - PIR1 Calibration problems resulted in small errornsagndrad60sC1.a1
D021211.4NSA/GNDRAD/C1 - IRT removed for testingnsagndrad60sC1.a1
D021211.8NSA/GNDRAD/C1 - PIR offlinensagndrad60sC1.a1
D021211.9NSA/GNDRAD/C1 - Instrument maintenancensagndrad60sC1.a1
D021212.5NSA/GNDRAD/C1 - Bad PSP calibrations appliednsagndrad60sC1.a1
D990924.1NSA/GNDRAD/C1 - IRT insufficiently heatednsagndrad60sC1.a1


DQRID : D021211.10
Start DateStart TimeEnd DateEnd Time
01/19/1999183001/20/19992359
Subject:
NSA/GNDRAD/C1 - Unreasonable/missing PIR data due to maintenance
DataStreams:nsagndrad60sC1.a1
Description:
During this period, there are data gaps and the data that were
collected are unreasonable.  Instrument maintenance was being
performed
Measurements:nsagndrad60sC1.a1:
  • PSP1 unshaded maximum(psp1_max)
  • NET mean(net_mean)
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded mean(pir1_mean)
  • Net Radiation, Minima(net_min)
  • PIR1 unshaded minimum(pir1_min)
  • Net Radiation(net)
  • NET standard deviation(net_sd)
  • Net Radiation, Standard Deviation(net_std)
  • PSP1 unshaded mean(psp1_mean)
  • PSP1 unshaded minimum(psp1_min)
  • Net Radiation, Maxima(net_max)
  • PSP1 unshaded standard deviation(psp1_sd)


Back To Table of Contents

DQRID : D021211.11
Start DateStart TimeEnd DateEnd Time
09/01/1998000002/28/19992359
Subject:
NSA/GNDRAD/C1 - Noisy PIR Data
DataStreams:nsagndrad60sC1.a1
Description:
During the period referenced, the ground PIR was noisy in comparison to the sky PIR data.  
At the end of November, the noise increased to roughly 10 W/m2 from peak to peak.  After 
12/23/98, the noise decreased in amplitude but still had noisy patterns.  

On 01/17-18/99, there was an increase again in the noise level (4 GMT 01/17 - 5 GMT 
01/18). During this period the gndrad IRT data also exhibited noise patterns (the IRT was not 
operational).

In February, the instrument exhibited large noise variations again.  On 02/16, a wiring 
problem was corrected and the noise dropped back to 1-5 W/m2.  However, the noise levels 
began to increase again.
Measurements:nsagndrad60sC1.a1:
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded mean(pir1_mean)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded minimum(pir1_min)


Back To Table of Contents

DQRID : D021211.13
Start DateStart TimeEnd DateEnd Time
12/08/1998205112/15/19981200
Subject:
NSA/GNDRAD/C1 - PIR1 Calibration problems resulted in small error
DataStreams:nsagndrad60sC1.a1
Description:
The dome correction coefficients were not properly reset in calibration file until the 
early morning of 12/15. These errors probably account for less than 4% in error.
Measurements:nsagndrad60sC1.a1:
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded mean(pir1_mean)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded minimum(pir1_min)


Back To Table of Contents

DQRID : D021211.4
Start DateStart TimeEnd DateEnd Time
12/29/1999190005/19/20000000
Subject:
NSA/GNDRAD/C1 - IRT removed for testing
DataStreams:nsagndrad60sC1.a1
Description:
The IRT instrument was at PNNL for cold temperature modifications and testing. Instruments 
returned for the summer season. Data collected after the instrument return looks 
reasonable. 

IRT data recorded during the period the instrument was removed is bad.
Measurements:nsagndrad60sC1.a1:
  • IRT1 standard deviation(irt1_sd)
  • IRT1 mean(irt1_mean)
  • IRT1 maximum(irt1_max)
  • IRT1 minimum(irt1_min)


Back To Table of Contents

DQRID : D021211.8
Start DateStart TimeEnd DateEnd Time
02/16/1999003002/16/19992000
02/17/1999000002/17/19990100
Subject:
NSA/GNDRAD/C1 - PIR offline
DataStreams:nsagndrad60sC1.a1
Description:
The PIR was taken off line during this period; data recorded 
              during this period are garbage.
Measurements:nsagndrad60sC1.a1:
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded mean(pir1_mean)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded minimum(pir1_min)


Back To Table of Contents

DQRID : D021211.9
Start DateStart TimeEnd DateEnd Time
12/08/1998203012/08/19982050
Subject:
NSA/GNDRAD/C1 - Instrument maintenance
DataStreams:nsagndrad60sC1.a1
Description:
Instrument replaced. Data affected by the work done during this time.
Measurements:nsagndrad60sC1.a1:
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded mean(pir1_mean)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded minimum(pir1_min)


Back To Table of Contents

DQRID : D021212.5
Start DateStart TimeEnd DateEnd Time
01/21/1999000002/09/19992359
Subject:
NSA/GNDRAD/C1 - Bad PSP calibrations applied
DataStreams:nsagndrad60sC1.a1
Description:
The ground radiation data are bad during this period due to 
              erroneous calibration factors in the logger configuration file.
Measurements:nsagndrad60sC1.a1:
  • PSP1 unshaded maximum(psp1_max)
  • NET mean(net_mean)
  • PIR1 unshaded standard deviation(pir1_sd)
  • PIR1 unshaded maximum(pir1_max)
  • PIR1 unshaded mean(pir1_mean)
  • Net Radiation, Minima(net_min)
  • PIR1 unshaded minimum(pir1_min)
  • Net Radiation(net)
  • NET standard deviation(net_sd)
  • Net Radiation, Standard Deviation(net_std)
  • PSP1 unshaded mean(psp1_mean)
  • PSP1 unshaded minimum(psp1_min)
  • Net Radiation, Maxima(net_max)
  • PSP1 unshaded standard deviation(psp1_sd)


Back To Table of Contents

DQRID : D990924.1
Start DateStart TimeEnd DateEnd Time
04/06/1998215612/22/20002020
Subject:
NSA/GNDRAD/C1 - IRT insufficiently heated
DataStreams:nsagndrad60sC1.a1
Description:
IRT had insufficient heating to maintain an internal reference temperature above 0 degrees 
C.  Measurements of sky temperature were over-estimated when instrument was below 
freezing.
Measurements:nsagndrad60sC1.a1:
  • IRT1 standard deviation(irt1_sd)
  • IRT1 mean(irt1_mean)
  • IRT1 maximum(irt1_max)
  • IRT1 minimum(irt1_min)


Back To Table of Contents



END OF DATA