DQRID : D041112.1
Start DateStart TimeEnd DateEnd Time
11/11/2004201711/12/20042246
more
Subject:
NSA/METTWR/C2 - Instrument problem
DataStreams:nsamettwr2hC2.b1
Description:
CMH and PWS stopped reporting.  Communication cable found to be broken.
Suggestions: 
Measurements:nsamettwr2hC2.b1:
  • Cumulative Water Sum(CumH2O)
  • Present Weather Sensor Alarm(PWSAlarm)
  • Chilled Mirror Dew Point(CMHDP)
  • 1 hour Present Weather Code(PWCod1hr)
  • Precipitation Rate(PCPRate)
  • 1 minute Average Visibility(AvgVis1mi)
  • 10 minute Average Visibility(AvgVis10m)
  • Chilled Mirror Temperature(CMHTemp)
  • Instant Present Weather Code(InstPWCod)
  • Chilled Mirror Calculated Saturation Vapor Pressure(SatVPCMH)
  • Chilled Mirror Calculated Vapor Pressure(VPCMH)
  • 15 minute Present Weather Code(PWcod15mi)
  • Cumulative Snow Sum(CumSnow)
  • Chilled Mirror Calculated Relative Humidity(CMHRH)
more

Close this window