Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
08/09/1995 | 0930 | 08/09/1995 | 2030 | Does not affect quality |
Subject: | SGP/EBBR/E20 - Annual Calibration Changeout |
DataStreams: | sgp30ebbrE20.b1 |
Description: | On August 9, 1995 between 0930-2030 GMT, the changeout for annual calibration occurred at E20, Meeker, OK. Soil measurements data should be used with caution for the following week at least, as the sensors require time to "settle" into the soil. |
Suggestions: | |
Measurements: | sgp30ebbrE20.b1: more
|