Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
11/12/2014 | 1625 | 06/05/2015 | 1438 | Missing |
Subject: | ENA/CPC/C1 - Instrument Not Sampling due to repair and calibration |
DataStreams: | enaaoscpcfC1.a1 |
Description: | During this period the CPC was shipped back to the manufacturer to mitigate damage due to flooding. The instrument was found to be flooded. Repair and calibration was performed. Most of the down time was related to delays in shipment due to customs on Terceira Island. |
Suggestions: | |
Measurements: | enaaoscpcfC1.a1: more
|