Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
08/09/2005 | 0000 | 08/09/2005 | 0200 | Incorrect |
08/05/2005 | 0030 | 08/05/2005 | 0200 | Incorrect |
Subject: | TWP/QCRAD/C3 - Tower inverted for instrument testing and replacement |
DataStreams: | twpqcrad1longC3.s1, twpqcrad1longC3.c1, twpqcrad1longC3.s2, twpqcrad1longC3.c2 |
Description: | The tower at Darwin was brought down to test and replace the GNDRAD PIR on 8/5/2005 and the PSP on 8/9/2005. Upwelling fluxes are incorrect. Described in instrument DQR D050919.4. |
Suggestions: | Do not use upwelling fluxes during this time. |
Measurements: | twpqcrad1longC3.s2: more
twpqcrad1longC3.c2: more twpqcrad1longC3.s1: more twpqcrad1longC3.c1: more |