Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
08/20/2005 | 1930 | 04/12/2006 | 2040 | Suspect |
Subject: | SGP/QCRAD/E20 - Instrument noise |
DataStreams: | sgpqcrad1longE20.s2, sgpqcrad1longE20.s1, sgpqcrad1longE20.c2, sgpqcrad1longE20.c1 |
Description: | Afer recovery from lightning strike the upwelling longwave SIRS Eppley PIR (UIR) had noise on both dome and case thermistor measurements. On 4/12/2006 techs replaced defective j-panel at base of tower. Noise didn't appear to have a bias but standard deviation went from 12-13 W/m2 during noisy period back to .75-1.5W/m2 after noise problem was eliminated. Described in instrument DQR D060403.4 |
Suggestions: | Noise is not removable. Use at your discretion. |
Measurements: | sgpqcrad1longE20.s1: more
sgpqcrad1longE20.c1: more sgpqcrad1longE20.s2: more sgpqcrad1longE20.c2: more |