Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
11/13/2006 | 0900 | 01/23/2007 | 1930 | Incorrect |
Subject: | SGP/QCRAD/C1 - Upwelling SW cable problem |
DataStreams: | sgpqcrad1longC1.c2, sgpqcrad1longC1.s2, sgpqcrad1longC1.s1, sgpqcrad1longC1.c1 |
Description: | Starting 11/13/2006, the C1 SIRS Upwelling Shortwave (up_short_hemisp) started to show large differences in comparison to co-located E13 SIRS and C1 IRT25m. After much troubleshooting and gnashing of teeth it was discovered that rodents had chewed through the instrument cables at the bottom of the tilt tower. Cables were replaced 01/23/2007 1930GMT. Documented in instrument DQR D061121.2 |
Suggestions: | Data are not recoverable, disregard this data. |
Measurements: | sgpqcrad1longC1.c1: more
sgpqcrad1longC1.s1: more sgpqcrad1longC1.c2: more sgpqcrad1longC1.s2: more |