Description: | The CPC slowly clogged and the signal declined until the instrument was cleaned at which
point the signal would increase. The data is still a good relative measure of the daily
changes in the CN concentration, but the absolute value may be too low.
The mentor was unable to monitor the flow rate and operation in the CCN during operation.
The relative changes in CCN with %ss are likely fine, but the absolute values may be too
low or too high. Dust was prevalent at the site and likely contributed to the CCN signal
such that large dust particles appeared as droplets. |