Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
04/02/2011 | 2142 | 06/15/2011 | 1900 | Incorrect |
Subject: | SGP/SIRS/E20 - Upwelling LW incorrect |
DataStreams: | sgpsirsE20.b1, sgpsirs20sE20.a0 |
Description: | The UIR signal (up_long_hemisp datastream) had connection and cabling problems during the time period specified. Site ops personnel replaced the Multiplexer on 6/15/2011 at 19:00 resolving the problem. |
Suggestions: | |
Measurements: | sgpsirs20sE20.a0: more
sgpsirsE20.b1: more |