Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
10/19/1997 | 0000 | 11/01/1997 | 1400 | Incorrect |
Subject: | SHB/GNDRAD/C1 - Unrealistic values for infrared irradiance |
DataStreams: | shbgndrad60sC1.a1 |
Description: | The value of infrared irradiance measured by the PIR is negative during this period. These values are unrealistic. The cause of these unreasonable values is not known but this time period is during the initial set-up phase. At no times in this period are the values realistic. In addition, the Operators Logs note periods of heavy frosting. Even after cleaning, frost remained on the domes of the PIR. |
Suggestions: | |
Measurements: | shbgndrad60sC1.a1: more
|