Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
11/15/1995 | 2100 | 11/16/1995 | 1700 | Incorrect |
Subject: | SGP/EBBR/E9 - Annual calibration changeout |
DataStreams: | sgp5ebbrE9.b1, sgp30ebbrE9.b1, sgp15ebbrE9.b1 |
Description: | On November 15, 1995 the changeout for annual calibration occurred at E9, Ashton, KS. After installation of the new SEBS unit, RH output was zero. The next day site operations personnel found that the RH probe cable connections were loose. RH returned to normal after the connections were tightened at 1700 GMT on 16 November 1995. During the period of time that the connections were not made, the following data values are incorrect: 5 minute: hum_top, hum_bot, vp_top, vp_bot 15 minute: mv_hum_r, mv_hum_l 30 minute: hum_top, hum_bot, vp_top, vp_bot. |
Suggestions: | |
Measurements: | sgp30ebbrE9.b1: more
sgp15ebbrE9.b1: more sgp5ebbrE9.b1: more |