Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
05/05/2006 | 0000 | 01/08/2007 | 0000 | Incorrect |
Subject: | NIM/MWRP/M1 - 51.25 GHz channel calibration drifted |
DataStreams: | nimmwrpM1.b1 |
Description: | After a power outage on May 5 the 51.25 GHz had a slight change in the calibration. The resulting LWP computed by using all 6 channels increased of about 0.025 mm (25 g/m2). |
Suggestions: | Starting on May 5 it is suggested that only the 2-channel LWP retrieval be used. |
Measurements: | nimmwrpM1.b1: more
|