Start Date | Start Time | End Date | End Time | Data Quality Metric |
---|---|---|---|---|
07/16/1996 | 1500 | 07/16/1996 | 2230 | Missing |
Subject: | SGP/EBBR/E26 - Annual Calibration Changeout |
DataStreams: | sgp30ebbrE26.b1, sgp15ebbrE26.b1, sgp5ebbrE26.b1 |
Description: | On 16 November 1996 the EBBR changeout for annual calibration occurred at E26, Cement, OK. SEBS unit 2 was removed and unit 8 was installed. Between 1500 and 2230 GMT no data or incorrect data was collected; most of the data is missing. 3 month calibration checks were being performed. |
Suggestions: | |
Measurements: | sgp5ebbrE26.b1: more
sgp15ebbrE26.b1: more sgp30ebbrE26.b1: more |